The Federal Government has commenced a £746 million (approximately N1.45 trillion) modernisation of the Lagos Port Complex, Apapa, and Tin Can Island Port, in a major infrastructure investment aimed at addressing decades of underinvestment, reducing logistics costs and reversing annual economic losses estimated at $4 billion from port inefficiencies.
The project, flagged off on Wednesday by Adegboyega Oyetola, the minister of Marine and Blue Economy, alongside Taiwo Oyedele, the minister of Finance and Coordinating Minister of the Economy, is expected to reposition Nigeria as a leading maritime hub in Africa, attract international shipping lines and create at least 20,000 direct and indirect jobs.
Speaking at the groundbreaking ceremony at Tin Can Island Port, Oyetola said the modernisation was necessary to address the widening gap between Nigeria’s growing trade volumes and the capacity of its ageing port infrastructure.
He noted that Apapa Port, established in 1913, was more than a century old, while Tin Can Island Port was commissioned in 1977 when Nigeria’s population stood at approximately 67.2 million, annual trade was about $17 billion and cargo throughput was 8.11 million metric tonnes.
Read also: Nigeria spends $15m on orange imports despite 930,000-tonne harvest
The minister said the country’s economic and demographic profile had changed significantly, with its population now estimated at approximately 240 million, annual merchandise trade exceeding $100 billion and cargo throughput rising to 129.3 million metric tonnes.
This represents nearly a 16-fold increase in cargo throughput since Tin Can Island Port was commissioned, placing additional pressure on infrastructure that has not kept pace with the expansion of economic activities.
Oyetola said the disparity had made comprehensive modernisation unavoidable, warning that Nigeria risked losing more maritime business to competing ports in neighbouring countries if it failed to upgrade its facilities.
“The cost of inaction is far greater than the cost of modernisation,” he said, adding that Nigeria would not surrender its competitive advantage in regional and international maritime trade.
He said the government’s ambition was to attract more direct calls by international shipping lines, retain Nigerian-bound cargo, expand transshipment opportunities and establish the country’s ports as preferred gateways for trade across the African Continental Free Trade Area (AfCFTA).
Read also: Nigeria starts N1.45trn Lagos ports rebuild to cut $4bn loss
“Our ambition is to attract more direct calls by international shipping lines, retain Nigerian-bound cargo, expand transshipment opportunities and establish our ports as preferred gateways to trade across the African Continental Free Trade Area. We cannot achieve this ambition with infrastructure that falls behind the demands of modern shipping,” Oyetola said.
Port inefficiencies cost Nigeria $4bn annually
The minister said cargo dwell time at Nigerian ports had historically ranged between 10 and 18 days, compared with three to five days at leading international ports.
He explained that the prolonged clearance and evacuation of cargo had contributed to congestion, demurrage, storage charges and higher logistics costs for businesses, importers and exporters.
These inefficiencies, he said, were estimated to cost the Nigerian economy as much as $4 billion annually, weakening the competitiveness of locally produced goods and increasing the cost of doing business.
The minister warned that neighbouring countries had continued to invest in deep-sea port infrastructure and modern cargo-handling facilities to attract international shipping and transshipment traffic, creating a competitive challenge for Nigeria.
Under the modernisation programme, critical port infrastructure, including quay walls and berths, dredging and navigation channels, access facilities, cargo-handling equipment and operational systems, will be rehabilitated and upgraded.
Oyetola said the intervention would also support more integrated, efficient and digitally enabled port operations, addressing longstanding physical constraints that have contributed to delays in cargo handling and vessel movement.
He projected that the project would generate at least 20,000 direct and indirect jobs across construction, engineering, dredging, logistics, transportation, port operations and related services.
The minister said improved port efficiency would also support Nigeria’s non-oil export ambitions by enabling agricultural products, processed foods, solid minerals, manufactured goods, textiles and petrochemical products to reach regional and international markets at lower costs.
“Our agricultural products, processed foods, solid minerals, manufactured goods, textiles and petrochemical products must compete effectively in regional and global markets. Efficient ports will help exporters meet delivery schedules, reduce costs, preserve product quality and secure international buyers’ confidence,” he said.
He added that modernised port facilities would create a more enabling environment for manufacturers, agro-processors and micro, small and medium-sized enterprises seeking to expand their operations and participate in international trade.
Read also: Five transport projects set to transform mobility in Nigeria
FG plans cargo continuity during construction
To minimise disruptions to port activities during the construction period, Oyetola disclosed that he had approved the establishment of an Inter-Ministerial Committee comprising the Federal Ministry of Marine and Blue Economy, the Nigerian Ports Authority (NPA) and the Nigeria Ports Economic Regulatory Agency.
The committee is expected to develop a comprehensive Port Business Continuity and Cargo Flow Management Plan to coordinate construction activities and ensure the uninterrupted movement of cargo.
According to the minister, the plan will cover phased construction, vessel scheduling, cargo evacuation, truck traffic management and the use of alternative ports and transport modes where necessary.
He said the arrangement was necessary to ensure that the modernisation programme did not worsen congestion or disrupt businesses that depend on the two ports for their import and export activities.
Oyetola also said the Lagos ports project formed part of a wider national maritime transformation agenda, which included the approved modernisation of Onne, Rivers, Delta and Calabar ports.
Read also: Nigeria records £404m trade surplus with UK as British exports fall 25.9%
Oyedele highlights financing significance
Also speaking, Oyedele described the modernisation programme as a major step towards reducing the cost of doing business, improving Nigeria’s competitiveness and accelerating economic growth.
He said more efficient port operations would reduce delays and associated costs for importers and exporters, improve the competitiveness of Nigerian products and deliver wider benefits to manufacturers, farmers and consumers.
The finance minister described the transaction as Nigeria’s largest sovereign export credit transaction since 2009 and the first project in Nigeria for Poland’s Export Credit Insurance Corporation, KUKE.
He said the financing arrangement demonstrated international investor confidence in Nigeria’s economic reforms and the country’s infrastructure development prospects.
Oyedele reaffirmed the Federal Government’s commitment to providing timely approvals, maintaining a stable and predictable operating environment and ensuring transparency throughout the financing and implementation of the project.
NPA pledges delivery within approved standards
Abubakar Dantsoho, Managing Director of the Nigerian Ports Authority, described the groundbreaking as a landmark moment in the history of the authority, pledging that the project would be delivered in accordance with approved designs, engineering standards and contractual timelines.
He said the NPA would maintain robust technical supervision, quality assurance and effective coordination throughout the construction period, with particular attention to safety, environmental standards and continuity of port operations.
Source:


